I know it doesn’t look like much, but it is WAY better than it was on Friday! What’s left? Mud and tape the drywall (I’m not sure how much of this Hubbin got done after I left last night), texture the ceiling and walls, paint, fix the floor (lay down a new piece of board), and tile. I’m thinking its NOT getting done by the 4th of July….